Monitor — Ongoing Works
Rollup last refreshed: 2026-08-27 14:06:46.546602
Works ongoing
25
Sanctioned (pure scheme)
₹93.54 L
Expenditure since inception
₹84.03 L
Balance cost (unspent)
₹9.50 L
Wage ₹1.34 L · Material ₹8.16 L
Expenditure trend
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
Slowest spending this week — worth a look
Mandays trend
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Embankment
2 works
₹30.00 L sanctioned
₹26.45 L spent (88%)
02
Construction of Tank
5 works
₹23.59 L sanctioned
₹22.33 L spent (95%)
03
Construction of Check Dam/Stop Dam
1 works
₹14.99 L sanctioned
₹13.26 L spent (88%)
04
Farm Pond
2 works
₹9.02 L sanctioned
₹8.80 L spent (98%)
05
Repair & maint of Pond/ Tank
1 works
₹8.55 L sanctioned
₹8.34 L spent (97%)
06
Construction of Well
1 works
₹2.68 L sanctioned
₹1.87 L spent (70%)
07
Rural Housing
9 works
₹2.11 L sanctioned
₹1.46 L spent (69%)
08
Plantation
2 works
₹1.72 L sanctioned
₹80,768 spent (47%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹88,700 sanctioned
₹72,819 spent (82%)
10
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)