Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
23
Sanctioned (pure scheme)
₹42.91 L
Expenditure since inception
₹18.15 L
Balance cost (unspent)
₹24.76 L
Wage ₹15.28 L · Material ₹9.48 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
1 works
₹14.98 L sanctioned
₹6,525 spent (0%)
02
Construction of Road and Culvert
1 works
₹12.57 L sanctioned
₹11.71 L spent (93%)
03
Repair & maint of Pond/ Tank
1 works
₹4.78 L sanctioned
₹1.49 L spent (31%)
04
Rural Housing
15 works
₹3.49 L sanctioned
₹1.56 L spent (45%)
05
Farm Pond
2 works
₹2.83 L sanctioned
₹79,213 spent (28%)
06
Plantation
1 works
₹2.67 L sanctioned
₹1.44 L spent (54%)
07
Constr of Cement Concrete Roads
1 works
₹1.15 L sanctioned
₹81,432 spent (71%)
08
Solid and Liquid Waste Management
1 works
₹44,000 sanctioned
₹28,188 spent (64%)
09
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)