Monitor — Ongoing Works
Rollup last refreshed: 2026-09-01 08:57:48.415109
Works ongoing
37
Sanctioned (pure scheme)
₹52.15 L
Expenditure since inception
₹18.50 L
Balance cost (unspent)
₹33.65 L
Wage ₹19.62 L · Material ₹14.03 L
Expenditure trend
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
Slowest spending this week — worth a look
Mandays trend
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Trench
1 works
₹13.77 L sanctioned
₹12.64 L spent (92%)
02
Construction of Check Dam/Stop Dam
1 works
₹12.11 L sanctioned
₹2,448 spent (0%)
03
Rural Housing
29 works
₹7.83 L sanctioned
₹2.48 L spent (32%)
04
Construction of Tank
1 works
₹7.74 L sanctioned
₹84,902 spent (11%)
05
Repair & maint of Pond/ Tank
1 works
₹6.08 L sanctioned
₹1.76 L spent (29%)
06
Farm Pond
1 works
₹3.20 L sanctioned
₹62,901 spent (20%)
07
Constr of Cement Concrete Roads
1 works
₹1.20 L sanctioned
₹11,580 spent (10%)
08
Solid and Liquid Waste Management
2 works
₹22,000 sanctioned
₹0 spent (0%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Well
0 works
₹0 sanctioned
₹0 spent (0%)