Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
12
Sanctioned (pure scheme)
₹46.25 L
Expenditure since inception
₹3.37 L
Balance cost (unspent)
₹42.88 L
Wage ₹13.04 L · Material ₹29.84 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
4 works
₹39.15 L sanctioned
₹1.90 L spent (5%)
02
Constr of Cement Concrete Roads
3 works
₹2.48 L sanctioned
₹31,689 spent (13%)
03
Farm Pond
1 works
₹1.98 L sanctioned
₹33,040 spent (17%)
04
Construction of Bund
1 works
₹1.93 L sanctioned
₹22,260 spent (12%)
05
Rural Housing
3 works
₹70,470 sanctioned
₹60,102 spent (85%)
06
Construction of Fish Drying Infrastructure
0 works
₹0 sanctioned
₹0 spent (0%)
07
Construction of NADEP/Vermi Compost Pit
0 works
₹0 sanctioned
₹0 spent (0%)
08
Construction of Road and Culvert
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Tank
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)