Monitor — Ongoing Works
Rollup last refreshed: 2026-08-26 17:54:53.293656
Works ongoing
15
Sanctioned (pure scheme)
₹9.09 L
Expenditure since inception
₹3.67 L
Balance cost (unspent)
₹5.42 L
Wage ₹3.15 L · Material ₹2.27 L
Expenditure trend
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
Slowest spending this week — worth a look
Mandays trend
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
2 works
₹2.15 L sanctioned
₹1,326 spent (1%)
02
Rural Housing
9 works
₹2.11 L sanctioned
₹1.25 L spent (59%)
03
Constr of Cement Concrete Roads
1 works
₹1.77 L sanctioned
₹1.48 L spent (84%)
04
Constr of Gabion
1 works
₹1.50 L sanctioned
₹663 spent (0%)
05
Construction of Road and Culvert
1 works
₹98,000 sanctioned
₹85,866 spent (88%)
06
Construction of Canal
1 works
₹57,000 sanctioned
₹6,075 spent (11%)
07
Construction of Toilets
0 works
₹0 sanctioned
₹0 spent (0%)
08
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Well
0 works
₹0 sanctioned
₹0 spent (0%)