Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
64
Sanctioned (pure scheme)
₹1.01 Cr
Expenditure since inception
₹55.04 L
Balance cost (unspent)
₹45.77 L
Wage ₹26.06 L · Material ₹19.72 L
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
Slowest spending this week — worth a look
- SATNA — UNCHAHARA−₹95.19 L
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
1 works
₹24.96 L sanctioned
₹24.56 L spent (98%)
02
Farm Pond
8 works
₹19.73 L sanctioned
₹11.76 L spent (60%)
03
Plantation
7 works
₹14.74 L sanctioned
₹1.72 L spent (12%)
04
Rural Housing
39 works
₹9.16 L sanctioned
₹4.72 L spent (52%)
05
Construction of Well
3 works
₹9.07 L sanctioned
₹5.32 L spent (59%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹6.72 L sanctioned
₹2.26 L spent (34%)
07
Construction of Tank
1 works
₹4.85 L sanctioned
₹52,286 spent (11%)
08
Constr of Food Grain storage
1 works
₹4.25 L sanctioned
₹1.14 L spent (27%)
09
Construction of Percolation Tank
1 works
₹3.38 L sanctioned
₹2.00 L spent (59%)
10
Construction of Trench
1 works
₹3.18 L sanctioned
₹62,228 spent (20%)