Monitor — Ongoing Works
Rollup last refreshed: 2026-10-17 07:04:51.670761
Works ongoing
38
Sanctioned (pure scheme)
₹89.89 L
Expenditure since inception
₹13.55 L
Balance cost (unspent)
₹76.34 L
Wage ₹39.59 L · Material ₹36.75 L
Expenditure trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
Slowest spending this week — worth a look
- VIDISHA — LATERI−₹52.78 L
Mandays trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
2 works
₹24.84 L sanctioned
₹3.20 L spent (13%)
02
Construction of Well
5 works
₹16.12 L sanctioned
₹6.08 L spent (38%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹13.22 L sanctioned
₹821 spent (0%)
04
Plantation
5 works
₹9.44 L sanctioned
₹86,230 spent (9%)
05
Construction of Percolation Tank
1 works
₹7.96 L sanctioned
₹11,580 spent (1%)
06
Repair & maint of Water Harvesting Structures
1 works
₹6.97 L sanctioned
₹221 spent (0%)
07
Rural Housing
20 works
₹5.40 L sanctioned
₹2.43 L spent (45%)
08
Farm Pond
2 works
₹4.69 L sanctioned
₹10,117 spent (2%)
09
Cattle Shed
1 works
₹1.25 L sanctioned
₹74,739 spent (60%)
10
Construction of NADEP/Vermi Compost Pit
0 works
₹0 sanctioned
₹0 spent (0%)