Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
76
Sanctioned (pure scheme)
₹52.40 L
Expenditure since inception
₹29.15 L
Balance cost (unspent)
₹23.26 L
Wage ₹19.18 L · Material ₹4.08 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Trench
3 works
₹20.54 L sanctioned
₹17.63 L spent (86%)
02
Rural Housing
69 works
₹16.03 L sanctioned
₹6.29 L spent (39%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹7.44 L sanctioned
₹2.62 L spent (35%)
04
Construction of Tank
1 works
₹5.05 L sanctioned
₹79,604 spent (16%)
05
Construction of Check Dam/Stop Dam
1 works
₹2.79 L sanctioned
₹1.78 L spent (64%)
06
Farm Pond
1 works
₹55,865 sanctioned
₹3,393 spent (6%)
07
Constr of Gabion
0 works
₹0 sanctioned
₹0 spent (0%)
08
Construction of Bund
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Crematorium
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)