Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
28
Sanctioned (pure scheme)
₹38.91 L
Expenditure since inception
₹12.58 L
Balance cost (unspent)
₹26.33 L
Wage ₹17.76 L · Material ₹8.57 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
8 works
₹22.93 L sanctioned
₹6.99 L spent (30%)
02
Rural Housing
15 works
₹3.52 L sanctioned
₹1.78 L spent (50%)
03
Farm Pond
1 works
₹3.33 L sanctioned
₹71,544 spent (21%)
04
Repair & maint of Pond/ Tank
1 works
₹3.17 L sanctioned
₹1.90 L spent (60%)
05
Construction of Well
1 works
₹2.70 L sanctioned
₹94,221 spent (35%)
06
Constr of Gabion
1 works
₹2.43 L sanctioned
₹22,722 spent (9%)
07
Construction of NADEP/Vermi Compost Pit
1 works
₹81,889 sanctioned
₹2,316 spent (3%)
08
Construction of Toilets
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)