Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
20
Sanctioned (pure scheme)
₹19.97 L
Expenditure since inception
₹3.13 L
Balance cost (unspent)
₹16.84 L
Wage ₹4.70 L · Material ₹12.13 L
Expenditure trend
Slowest spending this month — worth a look
- KHANDWA — PANDHANA−₹80.86 L
- KHANDWA — KHANDWA−₹50.87 L
- SEONI — DHANAURA−₹37.90 L
Mandays trend
Lowest mandays this month — worth a look
- DHAR — KUKSHI-17,658
- DHAR — TIRLA-7,398
- JHABUA — THANDLA-4,753
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
1 works
₹14.54 L sanctioned
₹2.12 L spent (15%)
02
Rural Housing
17 works
₹3.99 L sanctioned
₹84,063 spent (21%)
03
Construction of Trench
1 works
₹1.05 L sanctioned
₹16,872 spent (16%)
04
Construction of NADEP/Vermi Compost Pit
1 works
₹38,599 sanctioned
₹487 spent (1%)
05
Construction of Recharge Pits
0 works
₹0 sanctioned
₹0 spent (0%)
06
Construction of Road and Culvert
0 works
₹0 sanctioned
₹0 spent (0%)
07
Construction of Spur
0 works
₹0 sanctioned
₹0 spent (0%)
08
Construction of Toilets
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)
10
Farm Pond
0 works
₹0 sanctioned
₹0 spent (0%)