MGNREGA Works Dashboard
Admin login

Monitor — Ongoing Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
Reset filters
Works ongoing
1,685
Sanctioned (pure scheme)
₹14.10 Cr
Expenditure since inception
₹5.51 Cr
Balance cost (unspent)
₹8.60 Cr
Wage ₹4.55 Cr · Material ₹4.05 Cr
Expenditure trend
₹56.98 Cr
This Week
₹182.70 Cr
Last Week
▼ 68.8% vs last week
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
Slowest spending this week — worth a look
  • KHANDWA — PANDHANA−₹93.68 L
Mandays trend
2,89,238
This Week
21,46,699
Last Week
▼ 86.5%
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
Lowest mandays this week — worth a look
  • DHAR — KUKSHI-17,723

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
34 works
₹4.39 Cr sanctioned
₹2.42 Cr spent (55%)
02
Rural Housing
1,376 works
₹3.23 Cr sanctioned
₹1.50 Cr spent (47%)
03
Plantation
125 works
₹2.95 Cr sanctioned
₹57.82 L spent (20%)
04
Construction of Percolation Tank
7 works
₹45.52 L sanctioned
₹4.36 L spent (10%)
05
Farm Pond
16 works
₹35.90 L sanctioned
₹8.45 L spent (24%)
06
Construction of Check Dam/Stop Dam
7 works
₹31.08 L sanctioned
₹4.38 L spent (14%)
07
Land Development
3 works
₹26.14 L sanctioned
₹2.73 L spent (10%)
08
Works for Flood Control and Protection
31 works
₹22.47 L sanctioned
₹4.23 L spent (19%)
09
Constr of Cement Concrete Roads
42 works
₹22.03 L sanctioned
₹13.19 L spent (60%)
10
Repair & maint of Water Harvesting Structures
2 works
₹22.00 L sanctioned
₹57,680 spent (3%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Rural Housing 1,376 3.23 1.50 1.73
47%
2 Plantation 125 2.95 0.58 2.37
20%
3 Constr of Cement Concrete Roads 42 0.22 0.13 0.09
60%
4 Construction of Road and Culvert 34 4.39 2.42 1.97
55%
5 Works for Flood Control and Protection 31 0.22 0.04 0.18
19%
6 Farm Pond 16 0.36 0.08 0.27
24%
7 Solid and Liquid Waste Management 7 0.06 0.03 0.03
54%
8 Construction of Percolation Tank 7 0.46 0.04 0.41
10%
9 Construction of Check Dam/Stop Dam 7 0.31 0.04 0.27
14%
10 Construction of NADEP/Vermi Compost Pit 5 0.07 0.01 0.06
12%
11 Constr of Aganwadi 5 0.15 0.11 0.04
72%
12 Repair & maint of Pond/ Tank 3 0.12 0.01 0.11
10%
13 Land Development 3 0.26 0.03 0.23
10%
14 Construction of Crematorium 3 0.08 0.05 0.03
60%
15 Repair & maint of Water Harvesting Structures 2 0.22 0.01 0.21
3%
16 Repair & Maint of Community infrastructure 2 0.15 0.14 0.00
98%
17 Constr of GP Bhawan 2 0.12 0.08 0.04
65%
18 Construction of Well 1 0.02 0.01 0.01
48%
19 Boulder Check/Gully Plug 1 0.09 0.00 0.09
0%
20 Community Sanitary Complex 1 0.00 0.00 0.00
85%
21 Constr of Food Grain storage 1 0.13 0.10 0.03
78%
22 Constr of Gabion 1 0.03 0.00 0.02
13%
23 Construction of Bund 1 0.03 0.00 0.03
11%
24 Construction of Embankment 1 0.00 0.00 0.00
0%
25 Construction of Play field 1 0.05 0.01 0.04
25%
26 Construction of Tank 1 0.15 0.02 0.12
15%
27 Construction of Toilets 1 0.00 0.00 0.00
93%
28 Construction of Trench 1 0.01 0.00 0.01
16%
29 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.02 0.00 0.02
17%
30 Repair & maint of Road 1 0.15 0.02 0.13
10%
31 Terracing 1 0.04 0.01 0.03
34%
32 Well Recharge 1 0.00 0.00 0.00
1%
Total 1,685 14.10 5.51 8.60
All 32 rows (zero-value rows hidden) ⇩ Export to Excel