Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
42
Sanctioned (pure scheme)
₹1.53 Cr
Expenditure since inception
₹35.24 L
Balance cost (unspent)
₹1.17 Cr
Wage ₹67.57 L · Material ₹49.87 L
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Slowest spending this week — worth a look
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
24 works
₹1.00 Cr sanctioned
₹20.14 L spent (20%)
02
Construction of Bund
4 works
₹17.54 L sanctioned
₹6.86 L spent (39%)
03
Construction of Check Dam/Stop Dam
2 works
₹13.03 L sanctioned
₹53,172 spent (4%)
04
Farm Pond
5 works
₹11.59 L sanctioned
₹5.07 L spent (44%)
05
Construction of Tank
1 works
₹6.21 L sanctioned
₹1.38 L spent (22%)
06
Construction of Trench
1 works
₹1.62 L sanctioned
₹13,902 spent (9%)
07
Repair & maint of Water Harvesting Structures
1 works
₹1.49 L sanctioned
₹41,616 spent (28%)
08
Rural Housing
3 works
₹70,470 sanctioned
₹39,547 spent (56%)
09
Works for Flood Control and Protection
1 works
₹45,000 sanctioned
₹31,320 spent (70%)
10
Construction of NADEP/Vermi Compost Pit
0 works
₹0 sanctioned
₹0 spent (0%)