Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
5
Sanctioned (pure scheme)
₹35.05 L
Expenditure since inception
₹15.49 L
Balance cost (unspent)
₹19.56 L
Wage ₹2.87 L · Material ₹16.69 L
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
Slowest spending this week — worth a look
- KHANDWA — PANDHANA−₹93.68 L
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
1 works
₹14.88 L sanctioned
₹12.11 L spent (81%)
02
Repair & Maint of Check Dam/Stop Dam
1 works
₹12.72 L sanctioned
₹5,880 spent (0%)
03
Construction of Recharge Pits
2 works
₹5.45 L sanctioned
₹2.02 L spent (37%)
04
Construction of Bund
1 works
₹2.00 L sanctioned
₹1.31 L spent (65%)
05
Construction of Crematorium
0 works
₹0 sanctioned
₹0 spent (0%)
06
Construction of Fish Drying Infrastructure
0 works
₹0 sanctioned
₹0 spent (0%)
07
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)
08
Construction of Road and Culvert
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)