Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
11
Sanctioned (pure scheme)
₹30.06 L
Expenditure since inception
₹9.96 L
Balance cost (unspent)
₹20.09 L
Wage ₹10.67 L · Material ₹9.42 L
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Slowest spending this week — worth a look
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
2 works
₹9.14 L sanctioned
₹4,500 spent (0%)
02
Construction of Well
2 works
₹8.73 L sanctioned
₹4.94 L spent (57%)
03
Plantation
5 works
₹8.41 L sanctioned
₹1.96 L spent (23%)
04
Farm Pond
2 works
₹3.78 L sanctioned
₹3.02 L spent (80%)
05
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)
06
Construction of Recharge Pits
0 works
₹0 sanctioned
₹0 spent (0%)
07
Construction of Road and Culvert
0 works
₹0 sanctioned
₹0 spent (0%)
08
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)
10
Culvert
0 works
₹0 sanctioned
₹0 spent (0%)