Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
25
Sanctioned (pure scheme)
₹30.13 L
Expenditure since inception
₹13.00 L
Balance cost (unspent)
₹17.12 L
Wage ₹11.19 L · Material ₹5.94 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Farm Pond
4 works
₹8.00 L sanctioned
₹2.95 L spent (37%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹7.76 L sanctioned
₹1.43 L spent (18%)
03
Constr of GP Bhawan
1 works
₹4.04 L sanctioned
₹3.71 L spent (92%)
04
Constr of Kitchen Shed
1 works
₹3.33 L sanctioned
₹7,560 spent (2%)
05
Rural Housing
13 works
₹3.22 L sanctioned
₹2.34 L spent (73%)
06
Construction of Well
1 works
₹1.64 L sanctioned
₹61,748 spent (38%)
07
Cattle Shed
1 works
₹1.03 L sanctioned
₹89,885 spent (88%)
08
Constr of Cement Concrete Roads
1 works
₹86,000 sanctioned
₹73,861 spent (86%)
09
Construction of Toilets
2 works
₹24,000 sanctioned
₹24,000 spent (100%)
10
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)