Monitor — Ongoing Works
Rollup last refreshed: 2026-10-17 06:52:51.148488
Works ongoing
4
Sanctioned (pure scheme)
₹19.29 L
Expenditure since inception
₹6,000
Balance cost (unspent)
₹19.23 L
Wage ₹5.26 L · Material ₹13.97 L
Expenditure trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
Slowest spending this week — worth a look
- VIDISHA — LATERI−₹52.78 L
Mandays trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
1 works
₹17.00 L sanctioned
₹0 spent (0%)
02
Construction of Trench
1 works
₹2.00 L sanctioned
₹6,000 spent (3%)
03
Solid and Liquid Waste Management
2 works
₹29,054 sanctioned
₹0 spent (0%)
04
Construction of Check Dam/Stop Dam
0 works
₹0 sanctioned
₹0 spent (0%)
05
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)
06
Construction of Tank
0 works
₹0 sanctioned
₹0 spent (0%)
07
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)
08
Construction of Well
0 works
₹0 sanctioned
₹0 spent (0%)
09
Farm Pond
0 works
₹0 sanctioned
₹0 spent (0%)
10
Goat Shelter
0 works
₹0 sanctioned
₹0 spent (0%)