Monitor — Ongoing Works
Rollup last refreshed: 2026-10-14 07:05:44.899714
Works ongoing
18
Sanctioned (pure scheme)
₹1.70 Cr
Expenditure since inception
₹41.92 L
Balance cost (unspent)
₹1.28 Cr
Wage ₹39.86 L · Material ₹88.53 L
Expenditure trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
Slowest spending this week — worth a look
- SHIVPURI — KOLARAS−₹34,632
Mandays trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹1.12 Cr sanctioned
₹28.55 L spent (25%)
02
Repair & maint of Water Harvesting Structures
2 works
₹19.92 L sanctioned
₹93,228 spent (5%)
03
Construction of Well
5 works
₹17.36 L sanctioned
₹9.13 L spent (53%)
04
Construction of Check Dam/Stop Dam
1 works
₹12.97 L sanctioned
₹6,432 spent (0%)
05
Construction of Trench
2 works
₹4.03 L sanctioned
₹1.52 L spent (38%)
06
Roof Water Harvesting on gov/panchayat bldg
1 works
₹1.91 L sanctioned
₹82,898 spent (43%)
07
Rural Housing
6 works
₹1.71 L sanctioned
₹88,977 spent (52%)
08
Construction of Canal
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Crematorium
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of NADEP/Vermi Compost Pit
0 works
₹0 sanctioned
₹0 spent (0%)