MGNREGA Works Dashboard
Admin login

Monitor — Ongoing Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
Reset filters
Works ongoing
19
Sanctioned (pure scheme)
₹1.92 Cr
Expenditure since inception
₹1.39 Cr
Balance cost (unspent)
₹52.89 L
Wage ₹39.77 L · Material ₹13.12 L
Expenditure trend
₹5.71 Cr
This Week
₹7.23 Cr
Last Week
▼ 21% vs last week
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
Slowest spending this week — worth a look
  • DHAR — TIRLA−₹1.74 Cr
Mandays trend
-2,27,622
This Week
-2,14,690
Last Week
▼ 6%
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
Lowest mandays this week — worth a look
  • DHAR — KUKSHI-1,24,453

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
5 works
₹55.09 L sanctioned
₹34.46 L spent (63%)
02
Construction of Trench
2 works
₹29.67 L sanctioned
₹26.65 L spent (90%)
03
Construction of Percolation Tank
1 works
₹24.73 L sanctioned
₹19.43 L spent (79%)
04
Construction of Tank
2 works
₹22.70 L sanctioned
₹16.47 L spent (73%)
05
Construction of Road and Culvert
1 works
₹14.99 L sanctioned
₹13.87 L spent (93%)
06
Construction of Check Dam/Stop Dam
1 works
₹14.48 L sanctioned
₹12.50 L spent (86%)
07
Works for Flood Control and Protection
1 works
₹13.01 L sanctioned
₹5.76 L spent (44%)
08
Farm Pond
2 works
₹9.82 L sanctioned
₹6.05 L spent (62%)
09
Boulder Check/Gully Plug
2 works
₹7.59 L sanctioned
₹4.19 L spent (55%)
10
Construction of Recharge Pits
1 works
₹18,200 sanctioned
₹0 spent (0%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Plantation 5 55.09 34.46 20.63
63%
2 Construction of Trench 2 29.67 26.65 3.02
90%
3 Construction of Tank 2 22.70 16.47 6.23
73%
4 Farm Pond 2 9.82 6.05 3.77
62%
5 Boulder Check/Gully Plug 2 7.59 4.19 3.40
55%
6 Works for Flood Control and Protection 1 13.01 5.76 7.25
44%
7 Constr of Cement Concrete Roads 1 0.11 0.11 0.00
100%
8 Construction of Check Dam/Stop Dam 1 14.48 12.50 1.98
86%
9 Construction of Percolation Tank 1 24.73 19.43 5.31
79%
10 Construction of Recharge Pits 1 0.18 0.00 0.18
0%
11 Construction of Road and Culvert 1 14.99 13.87 1.12
93%
Total 19 192.38 139.49 52.89
All 11 rows (zero-value rows hidden) ⇩ Export to Excel