| Sr. | New Work Type | Ongoing works | Sanctioned | Expenditure | Balance cost | Exp. % |
|---|---|---|---|---|---|---|
| 1 | Construction of Tank | 14 | 2.40 | 0.00 | 2.40 | 0% |
| 2 | Rural Housing | 4 | 0.01 | 0.00 | 0.01 | 0% |
| 3 | Plantation | 1 | 0.05 | 0.00 | 0.05 | 0% |
| 4 | Works for Flood Control and Protection | 1 | 0.14 | 0.00 | 0.14 | 0% |
| 5 | Construction of Check Dam/Stop Dam | 1 | 0.04 | 0.00 | 0.04 | 0% |
| 6 | Terracing | 1 | 0.05 | 0.00 | 0.05 | 0% |
| Total | 22 | 2.68 | 0.00 | 2.68 |