Monitor — Ongoing Works
Rollup last refreshed: 2026-09-26 07:03:36.929547
Works ongoing
74
Sanctioned (pure scheme)
₹1.26 Cr
Expenditure since inception
₹65.29 L
Balance cost (unspent)
₹60.85 L
Wage ₹27.32 L · Material ₹33.52 L
Expenditure trend
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
Slowest spending this week — worth a look
Mandays trend
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
9 works
₹25.20 L sanctioned
₹10.28 L spent (41%)
02
Construction of Road and Culvert
1 works
₹24.82 L sanctioned
₹23.96 L spent (97%)
03
Repair & maint of Pond/ Tank
2 works
₹18.86 L sanctioned
₹15.98 L spent (85%)
04
Construction of Check Dam/Stop Dam
3 works
₹14.13 L sanctioned
₹7.47 L spent (53%)
05
Rural Housing
49 works
₹13.18 L sanctioned
₹4.90 L spent (37%)
06
Constr of Aganwadi
2 works
₹12.92 L sanctioned
₹98,345 spent (8%)
07
Plantation
5 works
₹12.60 L sanctioned
₹63,805 spent (5%)
08
Farm Pond
3 works
₹4.43 L sanctioned
₹1.07 L spent (24%)
09
Construction of Toilets
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)