MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Monitor — Ongoing Works

Rollup last refreshed: 2026-10-22 06:53:03.742068
to
Reset filters
Works ongoing
142
Sanctioned (pure scheme)
₹1.25 Cr
Expenditure since inception
₹1.44 L
Balance cost (unspent)
₹1.24 Cr
Wage ₹85.26 L · Material ₹38.26 L
Expenditure trend
₹23.37 Cr
This Week
₹83.39 Cr
Last Week
▼ 72% vs last week
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
19-Oct
Slowest spending this week — worth a look
  • KATNI — BADWARA−₹27.11 L
Mandays trend
5,98,318
This Week
12,00,800
Last Week
▼ 50.2%
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
19-Oct
Lowest mandays this week — worth a look
  • BETUL — GHORA DONGRI0

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Rural Housing
116 works
₹31.32 L sanctioned
₹58,800 spent (2%)
02
Construction of Road and Culvert
1 works
₹24.96 L sanctioned
₹0 spent (0%)
03
Farm Pond
9 works
₹21.72 L sanctioned
₹67,500 spent (3%)
04
Plantation
7 works
₹14.74 L sanctioned
₹17,400 spent (1%)
05
Construction of Well
3 works
₹9.07 L sanctioned
₹0 spent (0%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹6.72 L sanctioned
₹0 spent (0%)
07
Construction of Tank
1 works
₹4.85 L sanctioned
₹0 spent (0%)
08
Constr of Food Grain storage
1 works
₹4.25 L sanctioned
₹0 spent (0%)
09
Construction of Percolation Tank
1 works
₹3.38 L sanctioned
₹0 spent (0%)
10
Construction of Trench
1 works
₹3.18 L sanctioned
₹0 spent (0%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Rural Housing 116 31.32 0.59 30.73
2%
2 Farm Pond 9 21.72 0.68 21.05
3%
3 Plantation 7 14.74 0.17 14.57
1%
4 Construction of Well 3 9.07 0.00 9.07
0%
5 Construction of Tank 1 4.85 0.00 4.85
0%
6 Construction of Trench 1 3.18 0.00 3.18
0%
7 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 6.72 0.00 6.72
0%
8 Constr of Cement Concrete Roads 1 0.78 0.00 0.78
0%
9 Constr of Food Grain storage 1 4.25 0.00 4.25
0%
10 Construction of Percolation Tank 1 3.38 0.00 3.38
0%
11 Construction of Road and Culvert 1 24.96 0.00 24.96
0%
Total 142 124.96 1.44 123.52
All 11 rows (zero-value rows hidden) ⇩ Export to Excel