Monitor — Ongoing Works
Rollup last refreshed: 2026-09-19 07:03:09.195652
Works ongoing
42
Sanctioned (pure scheme)
₹67.30 L
Expenditure since inception
₹35.33 L
Balance cost (unspent)
₹31.98 L
Wage ₹21.04 L · Material ₹10.94 L
Expenditure trend
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Slowest spending this week — worth a look
- RAJGARH — SARANGPUR−₹1.04 Cr
Mandays trend
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
1 works
₹14.96 L sanctioned
₹11.52 L spent (77%)
02
Construction of Tank
1 works
₹14.84 L sanctioned
₹1.58 L spent (11%)
03
Farm Pond
3 works
₹13.53 L sanctioned
₹3.82 L spent (28%)
04
Rural Housing
33 works
₹8.91 L sanctioned
₹6.72 L spent (75%)
05
Plantation
2 works
₹7.26 L sanctioned
₹4.16 L spent (57%)
06
Construction of Road and Culvert
1 works
₹7.15 L sanctioned
₹6.95 L spent (97%)
07
Constr of Cement Concrete Roads
1 works
₹65,000 sanctioned
₹60,224 spent (93%)
08
Construction of Toilets
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)