Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
0.2%
OF COST SPENT
₹13,470 spent
of ₹66.04 L sanctioned
₹65.91 L still to spend
on 21 ongoing works
Works ongoing
21
Open the list of these works →
Sanctioned
₹66.04 L
Pure scheme (wage + material)
Expenditure since inception
₹13,470
0.2% of sanction
Balance cost (unspent)
₹65.91 L
Wage₹24.43 L
Material₹41.47 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh