Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
9,654
Sanctioned (pure scheme)
₹120.57 Cr
Expenditure since inception
₹55.93 Cr
Balance cost (unspent)
₹64.64 Cr
Wage ₹40.01 Cr · Material ₹24.63 Cr
Expenditure trend
Slowest spending this month — worth a look
- KHANDWA — PANDHANA−₹80.86 L
- KHANDWA — KHANDWA−₹50.87 L
- SEONI — DHANAURA−₹37.90 L
Mandays trend
Lowest mandays this month — worth a look
- DHAR — KUKSHI-17,658
- DHAR — TIRLA-7,398
- JHABUA — THANDLA-4,753
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
692 works
₹18.45 Cr sanctioned
₹5.20 Cr spent (28%)
02
Construction of Tank
163 works
₹17.34 Cr sanctioned
₹7.54 Cr spent (44%)
03
Rural Housing
6,413 works
₹15.65 Cr sanctioned
₹10.59 Cr spent (68%)
04
Farm Pond
405 works
₹10.54 Cr sanctioned
₹4.13 Cr spent (39%)
05
Construction of Check Dam/Stop Dam
127 works
₹9.54 Cr sanctioned
₹4.41 Cr spent (46%)
06
Construction of Well
318 works
₹7.26 Cr sanctioned
₹3.48 Cr spent (48%)
07
Land Development
171 works
₹6.33 Cr sanctioned
₹3.31 Cr spent (52%)
08
Construction of Road and Culvert
35 works
₹4.76 Cr sanctioned
₹3.89 Cr spent (82%)
09
Repair & maint of Pond/ Tank
74 works
₹4.67 Cr sanctioned
₹1.74 Cr spent (37%)
10
Construction of Percolation Tank
84 works
₹3.57 Cr sanctioned
₹1.74 Cr spent (49%)