Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
16,926
Sanctioned (pure scheme)
₹125.29 Cr
Expenditure since inception
₹58.05 Cr
Balance cost (unspent)
₹67.24 Cr
Wage ₹37.09 Cr · Material ₹30.15 Cr
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
Slowest spending this week — worth a look
- KHANDWA — PANDHANA−₹93.68 L
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
1,187 works
₹35.41 Cr sanctioned
₹17.95 Cr spent (51%)
02
Rural Housing
13,612 works
₹31.96 Cr sanctioned
₹18.41 Cr spent (58%)
03
Construction of Well
887 works
₹22.03 Cr sanctioned
₹10.59 Cr spent (48%)
04
Construction of Check Dam/Stop Dam
132 works
₹5.99 Cr sanctioned
₹1.30 Cr spent (22%)
05
Cattle Shed
236 works
₹5.58 Cr sanctioned
₹2.74 Cr spent (49%)
06
Construction of Trench
88 works
₹3.74 Cr sanctioned
₹59.96 L spent (16%)
07
Farm Pond
125 works
₹2.92 Cr sanctioned
₹51.64 L spent (18%)
08
Construction of Tank
55 works
₹2.30 Cr sanctioned
₹69.32 L spent (30%)
09
Construction of Percolation Tank
22 works
₹1.83 Cr sanctioned
₹26.69 L spent (15%)
10
Construction of Road and Culvert
16 works
₹1.69 Cr sanctioned
₹83.64 L spent (49%)