Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
39.7%
OF COST SPENT
₹17.76 L spent
of ₹44.69 L sanctioned
₹26.93 L still to spend
on 42 ongoing works
Works ongoing
42
Open the list of these works →
Sanctioned
₹44.69 L
Pure scheme (wage + material)
Expenditure since inception
₹17.76 L
39.7% of sanction
Balance cost (unspent)
₹26.93 L
Wage₹18.80 L
Material₹8.13 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block