Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
3,901
Sanctioned (pure scheme)
₹78.22 Cr
Expenditure since inception
₹29.93 Cr
Balance cost (unspent)
₹48.29 Cr
Wage ₹24.42 Cr · Material ₹23.87 Cr
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
Slowest spending this week — worth a look
- KHANDWA — PANDHANA−₹93.68 L
Mandays trend
Lowest mandays this month — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
629 works
₹17.30 Cr sanctioned
₹4.73 Cr spent (27%)
02
Construction of Tank
62 works
₹8.11 Cr sanctioned
₹4.61 Cr spent (57%)
03
Construction of Well
154 works
₹4.89 Cr sanctioned
₹2.10 Cr spent (43%)
04
Repair & maint of Pond/ Tank
67 works
₹4.81 Cr sanctioned
₹2.53 Cr spent (53%)
05
Constr of Cement Concrete Roads
116 works
₹4.51 Cr sanctioned
₹83.31 L spent (18%)
06
Rural Housing
1,823 works
₹4.29 Cr sanctioned
₹2.53 Cr spent (59%)
07
Construction of Trench
48 works
₹4.11 Cr sanctioned
₹1.20 Cr spent (29%)
08
Construction of Bund
89 works
₹3.90 Cr sanctioned
₹1.53 Cr spent (39%)
09
Construction of Check Dam/Stop Dam
28 works
₹3.21 Cr sanctioned
₹1.87 Cr spent (58%)
10
Farm Pond
192 works
₹2.79 Cr sanctioned
₹90.46 L spent (32%)