Monitor — Ongoing Works
Rollup last refreshed: 2026-09-20 07:03:41.950739
Works ongoing
16
Sanctioned (pure scheme)
₹28.28 L
Expenditure since inception
₹15.67 L
Balance cost (unspent)
₹12.62 L
Wage ₹6.06 L · Material ₹6.55 L
Expenditure trend
Jun-26
Jul-26
Aug-26
Sep-26
Slowest spending this month — worth a look
Mandays trend
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
1 works
₹12.10 L sanctioned
₹8.96 L spent (74%)
02
Construction of Well
5 works
₹10.42 L sanctioned
₹5.15 L spent (49%)
03
Construction of Check Dam/Stop Dam
1 works
₹3.33 L sanctioned
₹55,730 spent (17%)
04
Rural Housing
9 works
₹2.43 L sanctioned
₹1.00 L spent (41%)
05
Construction of Bund
0 works
₹0 sanctioned
₹0 spent (0%)
06
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)
07
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)
09
Deepening / Desilting of Flood Channels
0 works
₹0 sanctioned
₹0 spent (0%)
10
Farm Pond
0 works
₹0 sanctioned
₹0 spent (0%)