Monitor — Ongoing Works
Rollup last refreshed: 2026-09-16 08:34:45.218851
Works ongoing
9
Sanctioned (pure scheme)
₹1.19 Cr
Expenditure since inception
₹75.49 L
Balance cost (unspent)
₹43.55 L
Wage ₹32.91 L · Material ₹10.65 L
Expenditure trend
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Mandays trend
Jun-26
Jul-26
Aug-26
Sep-26
Lowest mandays this month — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
2 works
₹39.66 L sanctioned
₹26.83 L spent (68%)
02
Construction of Trench
3 works
₹34.81 L sanctioned
₹12.69 L spent (36%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹28.11 L sanctioned
₹24.19 L spent (86%)
04
Works for Flood Control and Protection
1 works
₹14.11 L sanctioned
₹10.04 L spent (71%)
05
Construction of Crematorium
1 works
₹2.35 L sanctioned
₹1.74 L spent (74%)
06
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)
07
Construction of Recharge Pits
0 works
₹0 sanctioned
₹0 spent (0%)
08
Boulder Check/Gully Plug
0 works
₹0 sanctioned
₹0 spent (0%)
09
Farm Pond
0 works
₹0 sanctioned
₹0 spent (0%)
10
Land Development
0 works
₹0 sanctioned
₹0 spent (0%)