Monitor — Ongoing Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Works ongoing
26
Sanctioned (pure scheme)
₹30.32 L
Expenditure since inception
₹17.85 L
Balance cost (unspent)
₹12.46 L
Wage ₹5.91 L · Material ₹6.55 L
Expenditure trend
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
Mandays trend
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
1 works
₹12.10 L sanctioned
₹8.96 L spent (74%)
02
Construction of Well
5 works
₹10.42 L sanctioned
₹5.15 L spent (49%)
03
Rural Housing
19 works
₹4.46 L sanctioned
₹3.19 L spent (72%)
04
Construction of Check Dam/Stop Dam
1 works
₹3.33 L sanctioned
₹55,730 spent (17%)
05
Construction of Bund
0 works
₹0 sanctioned
₹0 spent (0%)
06
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)
07
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)
09
Deepening / Desilting of Flood Channels
0 works
₹0 sanctioned
₹0 spent (0%)
10
Farm Pond
0 works
₹0 sanctioned
₹0 spent (0%)