Monitor — Ongoing Works

Rollup last refreshed: 2026-09-08 06:51:44.520597
to
Reset filters
Works ongoing
19
Sanctioned (pure scheme)
₹1.92 Cr
Expenditure since inception
₹0
Balance cost (unspent)
₹1.92 Cr
Wage ₹1.02 Cr · Material ₹90.51 L
Expenditure trend
₹5.04 Cr
This Week
₹29.36 Cr
Last Week
▼ 82.8% vs last week
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
Slowest spending this week — worth a look
  • SAGAR — REHLI−₹29.44 L
Mandays trend
2,87,836
This Week
12,69,101
Last Week
▼ 77.3%
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
Lowest mandays this week — worth a look
  • SAGAR — MALTHONE-34

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
5 works
₹55.09 L sanctioned
₹0 spent (0%)
02
Construction of Trench
2 works
₹29.67 L sanctioned
₹0 spent (0%)
03
Construction of Percolation Tank
1 works
₹24.73 L sanctioned
₹0 spent (0%)
04
Construction of Tank
2 works
₹22.70 L sanctioned
₹0 spent (0%)
05
Construction of Road and Culvert
1 works
₹14.99 L sanctioned
₹0 spent (0%)
06
Construction of Check Dam/Stop Dam
1 works
₹14.48 L sanctioned
₹0 spent (0%)
07
Works for Flood Control and Protection
1 works
₹13.01 L sanctioned
₹0 spent (0%)
08
Farm Pond
2 works
₹9.82 L sanctioned
₹0 spent (0%)
09
Boulder Check/Gully Plug
2 works
₹7.59 L sanctioned
₹0 spent (0%)
10
Construction of Recharge Pits
1 works
₹18,200 sanctioned
₹0 spent (0%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Plantation 5 55.09 0.00 55.09
0%
2 Boulder Check/Gully Plug 2 7.59 0.00 7.59
0%
3 Construction of Tank 2 22.70 0.00 22.70
0%
4 Construction of Trench 2 29.67 0.00 29.67
0%
5 Farm Pond 2 9.82 0.00 9.82
0%
6 Works for Flood Control and Protection 1 13.01 0.00 13.01
0%
7 Constr of Cement Concrete Roads 1 0.11 0.00 0.11
0%
8 Construction of Recharge Pits 1 0.18 0.00 0.18
0%
9 Construction of Road and Culvert 1 14.99 0.00 14.99
0%
10 Construction of Check Dam/Stop Dam 1 14.48 0.00 14.48
0%
11 Construction of Percolation Tank 1 24.73 0.00 24.73
0%
Total 19 192.38 0.00 192.38
All 11 rows (zero-value rows hidden) ⇩ Export to Excel