Monitor — Ongoing Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
Reset filters
Works ongoing
13
Sanctioned (pure scheme)
₹1.00 Cr
Expenditure since inception
₹49.74 L
Balance cost (unspent)
₹50.31 L
Wage ₹25.64 L · Material ₹24.68 L
Expenditure trend
−₹1.91 Cr
This Week
₹5.71 Cr
Last Week
▼ 133.5% vs last week
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Slowest spending this week — worth a look
  • DHAR — TIRLA−₹1.20 Cr
Mandays trend
-1,47,030
This Week
-2,27,622
Last Week
▲ 35.4%
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Lowest mandays this week — worth a look
  • DHAR — KUKSHI-88,895

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
2 works
₹26.10 L sanctioned
₹24.31 L spent (93%)
02
Works for Flood Control and Protection
2 works
₹22.47 L sanctioned
₹8.96 L spent (40%)
03
Construction of Tank
1 works
₹14.96 L sanctioned
₹3.06 L spent (20%)
04
Construction of Check Dam/Stop Dam
1 works
₹14.57 L sanctioned
₹5.38 L spent (37%)
05
Construction of Embankment
1 works
₹9.66 L sanctioned
₹5.49 L spent (57%)
06
Constr of GP Bhawan
1 works
₹8.03 L sanctioned
₹1.29 L spent (16%)
07
Plantation
1 works
₹2.67 L sanctioned
₹0 spent (0%)
08
Constr of Cement Concrete Roads
1 works
₹68,531 sanctioned
₹74,652 spent (109%)
09
Rural Housing
2 works
₹46,980 sanctioned
₹9,396 spent (20%)
10
Construction of NADEP/Vermi Compost Pit
1 works
₹45,000 sanctioned
₹42,846 spent (95%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Works for Flood Control and Protection 2 22.47 8.96 13.51
40%
2 Construction of Road and Culvert 2 26.10 24.31 1.79
93%
3 Rural Housing 2 0.47 0.09 0.38
20%
4 Construction of Check Dam/Stop Dam 1 14.57 5.38 9.19
37%
5 Constr of GP Bhawan 1 8.03 1.29 6.74
16%
6 Construction of Embankment 1 9.66 5.49 4.18
57%
7 Construction of NADEP/Vermi Compost Pit 1 0.45 0.43 0.02
95%
8 Plantation 1 2.67 0.00 2.67
0%
9 Construction of Tank 1 14.96 3.06 11.90
21%
10 Constr of Cement Concrete Roads 1 0.69 0.75 −0.06
109%
Total 13 100.05 49.74 50.31