| Sr. | New Work Type | Ongoing works | Sanctioned | Expenditure | Balance cost | Exp. % |
|---|---|---|---|---|---|---|
| 1 | Works for Flood Control and Protection | 2 | 29.16 | 25.42 | 3.74 | 87% |
| 2 | Construction of Bund | 2 | 29.87 | 6.21 | 23.66 | 21% |
| 3 | Farm Pond | 2 | 2.95 | 0.88 | 2.08 | 30% |
| 4 | Construction of Check Dam/Stop Dam | 2 | 18.06 | 8.85 | 9.21 | 49% |
| 5 | Cattle Shed | 1 | 37.85 | 32.27 | 5.57 | 85% |
| 6 | Constr of GP Bhawan | 1 | 10.00 | 0.23 | 9.77 | 2% |
| Total | 10 | 127.88 | 73.86 | 54.02 |