MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Monitor — Ongoing Works

Rollup last refreshed: 2026-10-22 07:06:18.046564
to
Reset filters
Works ongoing
142
Sanctioned (pure scheme)
₹1.25 Cr
Expenditure since inception
₹61.35 L
Balance cost (unspent)
₹63.61 L
Wage ₹46.50 L · Material ₹17.11 L
Expenditure trend
₹23.37 Cr
This Week
₹82.60 Cr
Last Week
▼ 71.7% vs last week
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
19-Oct
Slowest spending this week — worth a look
  • KATNI — BADWARA−₹27.11 L
Mandays trend
5,98,318
This Week
11,66,079
Last Week
▼ 48.7%
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
19-Oct
Lowest mandays this week — worth a look
  • BETUL — CHICHOLI0

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Rural Housing
116 works
₹31.32 L sanctioned
₹3.73 L spent (12%)
02
Construction of Road and Culvert
1 works
₹24.96 L sanctioned
₹24.56 L spent (98%)
03
Farm Pond
9 works
₹21.72 L sanctioned
₹15.41 L spent (71%)
04
Plantation
7 works
₹14.74 L sanctioned
₹2.52 L spent (17%)
05
Construction of Well
3 works
₹9.07 L sanctioned
₹6.23 L spent (69%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹6.72 L sanctioned
₹3.64 L spent (54%)
07
Construction of Tank
1 works
₹4.85 L sanctioned
₹52,286 spent (11%)
08
Constr of Food Grain storage
1 works
₹4.25 L sanctioned
₹1.14 L spent (27%)
09
Construction of Percolation Tank
1 works
₹3.38 L sanctioned
₹2.56 L spent (76%)
10
Construction of Trench
1 works
₹3.18 L sanctioned
₹62,228 spent (20%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Rural Housing 116 31.32 3.73 27.59
12%
2 Farm Pond 9 21.72 15.41 6.31
71%
3 Plantation 7 14.74 2.52 12.22
17%
4 Construction of Well 3 9.07 6.23 2.84
69%
5 Construction of Road and Culvert 1 24.96 24.56 0.39
98%
6 Constr of Food Grain storage 1 4.25 1.14 3.11
27%
7 Construction of Tank 1 4.85 0.52 4.33
11%
8 Construction of Percolation Tank 1 3.38 2.56 0.82
76%
9 Construction of Trench 1 3.18 0.62 2.56
20%
10 Constr of Cement Concrete Roads 1 0.78 0.41 0.37
53%
11 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 6.72 3.64 3.08
54%
Total 142 124.96 61.35 63.61
All 11 rows (zero-value rows hidden) ⇩ Export to Excel