MGNREGA Works Dashboard
Admin login

Monitor — Ongoing Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
Reset filters
Works ongoing
64
Sanctioned (pure scheme)
₹1.01 Cr
Expenditure since inception
₹55.04 L
Balance cost (unspent)
₹45.77 L
Wage ₹26.06 L · Material ₹19.72 L
Expenditure trend
−₹1.70 Cr
This Week
₹5.71 Cr
Last Week
▼ 129.8% vs last week
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Mandays trend
-1,25,112
This Week
-2,27,622
Last Week
▲ 45%
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
1 works
₹24.96 L sanctioned
₹24.56 L spent (98%)
02
Farm Pond
8 works
₹19.73 L sanctioned
₹11.76 L spent (60%)
03
Plantation
7 works
₹14.74 L sanctioned
₹1.72 L spent (12%)
04
Rural Housing
39 works
₹9.16 L sanctioned
₹4.72 L spent (52%)
05
Construction of Well
3 works
₹9.07 L sanctioned
₹5.32 L spent (59%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹6.72 L sanctioned
₹2.26 L spent (34%)
07
Construction of Tank
1 works
₹4.85 L sanctioned
₹52,286 spent (11%)
08
Constr of Food Grain storage
1 works
₹4.25 L sanctioned
₹1.14 L spent (27%)
09
Construction of Percolation Tank
1 works
₹3.38 L sanctioned
₹2.00 L spent (59%)
10
Construction of Trench
1 works
₹3.18 L sanctioned
₹62,228 spent (20%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Rural Housing 39 9.16 4.72 4.44
52%
2 Farm Pond 8 19.73 11.76 7.97
60%
3 Plantation 7 14.74 1.72 13.02
12%
4 Construction of Well 3 9.07 5.32 3.75
59%
5 Construction of Road and Culvert 1 24.96 24.56 0.39
98%
6 Constr of Food Grain storage 1 4.25 1.14 3.11
27%
7 Construction of Tank 1 4.85 0.52 4.33
11%
8 Construction of Percolation Tank 1 3.38 2.00 1.38
59%
9 Construction of Trench 1 3.18 0.62 2.56
20%
10 Constr of Cement Concrete Roads 1 0.78 0.41 0.37
53%
11 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 6.72 2.26 4.46
34%
Total 64 100.81 55.04 45.77
All 11 rows (zero-value rows hidden) ⇩ Export to Excel