Monitor — Ongoing Works

Rollup last refreshed: 2026-09-23 07:03:14.247027
to
Reset filters
Works ongoing
16
Sanctioned (pure scheme)
₹20.83 L
Expenditure since inception
₹8.32 L
Balance cost (unspent)
₹12.51 L
Wage ₹3.66 L · Material ₹8.85 L
Expenditure trend
₹15.85 Cr
This Week
₹32.96 Cr
Last Week
▼ 51.9% vs last week
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
Slowest spending this week — worth a look
  • DEWAS — TONK KHURD−₹6,000
Mandays trend
5,07,181
This Week
10,95,849
Last Week
▼ 53.7%
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
Lowest mandays this week — worth a look
  • BHIND — MEHGAON6

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Roof Water Harvesting on gov/panchayat bldg
5 works
₹4.74 L sanctioned
₹33,247 spent (7%)
02
Construction of Tank
1 works
₹4.71 L sanctioned
₹2.99 L spent (64%)
03
Construction of Check Dam/Stop Dam
4 works
₹4.00 L sanctioned
₹1.44 L spent (36%)
04
Boulder Check/Gully Plug
3 works
₹3.21 L sanctioned
₹1.34 L spent (42%)
05
Construction of Well
1 works
₹2.00 L sanctioned
₹1.67 L spent (83%)
06
Farm Pond
1 works
₹1.91 L sanctioned
₹54,334 spent (28%)
07
Construction of Recharge Pits
1 works
₹26,299 sanctioned
₹690 spent (3%)
08
Construction of NADEP/Vermi Compost Pit
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Other Community Building/Assets
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Roof Water Harvesting on gov/panchayat bldg 5 4.74 0.33 4.41
7%
2 Construction of Check Dam/Stop Dam 4 4.00 1.44 2.56
36%
3 Boulder Check/Gully Plug 3 3.21 1.34 1.87
42%
4 Construction of Recharge Pits 1 0.26 0.01 0.26
3%
5 Farm Pond 1 1.91 0.54 1.37
29%
6 Construction of Well 1 2.00 1.67 0.33
83%
7 Construction of Tank 1 4.71 2.99 1.72
64%
Total 16 20.83 8.32 12.51
All 7 rows (zero-value rows hidden) ⇩ Export to Excel