| Sr. | New Work Type | Ongoing works | Sanctioned | Expenditure | Balance cost | Exp. % |
|---|---|---|---|---|---|---|
| 1 | Rural Housing | 8 | 1.98 | 1.02 | 0.96 | 51% |
| 2 | Construction of Tank | 2 | 29.08 | 25.83 | 3.25 | 89% |
| 3 | Farm Pond | 2 | 5.27 | 2.98 | 2.30 | 57% |
| 4 | Construction of Percolation Tank | 1 | 59.01 | 45.97 | 13.04 | 78% |
| 5 | Construction of Trench | 1 | 4.89 | 2.74 | 2.15 | 56% |
| 6 | Construction of Check Dam/Stop Dam | 1 | 4.00 | 2.51 | 1.49 | 63% |
| Total | 15 | 104.24 | 81.05 | 23.19 |