MGNREGA Works Dashboard
Admin login

Monitor — Ongoing Works

Rollup last refreshed: 2026-08-05 08:30:05.836701
to
Reset filters
Works ongoing
29
Sanctioned (pure scheme)
₹95.70 L
Expenditure since inception
₹41.49 L
Balance cost (unspent)
₹54.21 L
Wage ₹37.40 L · Material ₹16.80 L
Expenditure trend
−₹1.25 Cr
This Week
−₹1.70 Cr
Last Week
▲ 26.5% vs last week
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
Slowest spending this week — worth a look
  • DHAR — TIRLA−₹90.28 L
Mandays trend
-97,016
This Week
-1,25,112
Last Week
▲ 22.5%
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
Lowest mandays this week — worth a look
  • DHAR — KUKSHI-53,337

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Constr of Cement Concrete Roads
2 works
₹15.63 L sanctioned
₹7.47 L spent (48%)
02
Repair & Maint of Check Dam/Stop Dam
1 works
₹14.92 L sanctioned
₹14.25 L spent (96%)
03
Construction of Percolation Tank
1 works
₹14.56 L sanctioned
₹8.99 L spent (62%)
04
Repair & maint of Pond/ Tank
1 works
₹13.66 L sanctioned
₹3,360 spent (0%)
05
Construction of Check Dam/Stop Dam
4 works
₹10.70 L sanctioned
₹1.25 L spent (12%)
06
Plantation
3 works
₹7.26 L sanctioned
₹29,406 spent (4%)
07
Constr of Food Grain storage
1 works
₹4.00 L sanctioned
₹2,808 spent (1%)
08
Farm Pond
1 works
₹3.84 L sanctioned
₹1.27 L spent (33%)
09
Constr of Compound wall
1 works
₹3.80 L sanctioned
₹3.58 L spent (94%)
10
Rural Housing
10 works
₹2.48 L sanctioned
₹1.42 L spent (57%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Rural Housing 10 2.48 1.42 1.06
57%
2 Construction of Check Dam/Stop Dam 4 10.70 1.25 9.45
12%
3 Plantation 3 7.26 0.29 6.97
4%
4 Constr of Cement Concrete Roads 2 15.63 7.47 8.16
48%
5 Boulder Check/Gully Plug 1 2.10 0.45 1.65
21%
6 Constr of Compound wall 1 3.80 3.58 0.22
94%
7 Constr of Food Grain storage 1 4.00 0.03 3.98
1%
8 Construction of NADEP/Vermi Compost Pit 1 0.18 0.16 0.02
88%
9 Construction of Percolation Tank 1 14.56 8.99 5.57
62%
10 Construction of Well 1 2.30 2.21 0.09
96%
11 Farm Pond 1 3.84 1.27 2.57
33%
12 Repair & Maint of Check Dam/Stop Dam 1 14.92 14.25 0.67
96%
13 Repair & maint of Pond/ Tank 1 13.66 0.03 13.63
0%
14 Well Recharge 1 0.26 0.10 0.16
37%
Total 29 95.70 41.49 54.21
All 14 rows (zero-value rows hidden) ⇩ Export to Excel