Reset

Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
30.7%
OF COST SPENT
₹4.56 L spent
of ₹14.82 L sanctioned
₹10.27 L still to spend
on 22 ongoing works
Works ongoing
22
Open the list of these works →
Sanctioned
₹14.82 L
Pure scheme (wage + material)
Expenditure since inception
₹4.56 L
30.7% of sanction
Balance cost (unspent)
₹10.27 L
Wage₹8.29 L
Material₹1.97 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh