Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
39.1%
OF COST SPENT
₹27.61 Cr spent
of ₹70.59 Cr sanctioned
₹42.97 Cr still to spend
on 5,335 ongoing works
Works ongoing
5,335
Open the list of these works →
Sanctioned
₹70.59 Cr
Pure scheme (wage + material)
Expenditure since inception
₹27.61 Cr
39.1% of sanction
Balance cost (unspent)
₹42.97 Cr
Wage₹23.84 Cr
Material₹19.13 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block