Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
56.7%
OF COST SPENT
₹36.51 L spent
of ₹64.35 L sanctioned
₹27.84 L still to spend
on 32 ongoing works
Works ongoing
32
Open the list of these works →
Sanctioned
₹64.35 L
Pure scheme (wage + material)
Expenditure since inception
₹36.51 L
56.7% of sanction
Balance cost (unspent)
₹27.84 L
Wage₹8.82 L
Material₹19.03 L
Trend

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh