Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
58.2%
OF COST SPENT
₹42.14 L spent
of ₹72.37 L sanctioned
₹30.23 L still to spend
on 34 ongoing works
Works ongoing
34
Open the list of these works →
Sanctioned
₹72.37 L
Pure scheme (wage + material)
Expenditure since inception
₹42.14 L
58.2% of sanction
Balance cost (unspent)
₹30.23 L
Wage₹10.07 L
Material₹20.16 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh