Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
6.5%
OF COST SPENT
₹5.16 Cr spent
of ₹79.81 Cr sanctioned
₹74.65 Cr still to spend
on 6,971 ongoing works
Works ongoing
6,971
Open the list of these works →
Sanctioned
₹79.81 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.16 Cr
6.5% of sanction
Balance cost (unspent)
₹74.65 Cr
Wage₹44.24 Cr
Material₹30.41 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block