Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
23.2%
OF COST SPENT
₹8.40 L spent
of ₹36.27 L sanctioned
₹27.86 L still to spend
on 6 ongoing works
Works ongoing
6
Open the list of these works →
Sanctioned
₹36.27 L
Pure scheme (wage + material)
Expenditure since inception
₹8.40 L
23.2% of sanction
Balance cost (unspent)
₹27.86 L
Wage₹17.39 L
Material₹10.47 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh