Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
4.3%
OF COST SPENT
₹1.75 L spent
of ₹40.93 L sanctioned
₹39.19 L still to spend
on 54 ongoing works
Works ongoing
54
Open the list of these works →
Sanctioned
₹40.93 L
Pure scheme (wage + material)
Expenditure since inception
₹1.75 L
4.3% of sanction
Balance cost (unspent)
₹39.19 L
Wage₹29.71 L
Material₹9.47 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh