Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
55.1%
OF COST SPENT
₹123.09 Cr spent
of ₹223.34 Cr sanctioned
₹100.26 Cr still to spend
on 6,465 ongoing works
Works ongoing
6,465
Open the list of these works →
Sanctioned
₹223.34 Cr
Pure scheme (wage + material)
Expenditure since inception
₹123.09 Cr
55.1% of sanction
Balance cost (unspent)
₹100.26 Cr
Wage₹61.55 Cr
Material₹38.71 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block