Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
39.6%
OF COST SPENT
₹44.31 Cr spent
of ₹111.81 Cr sanctioned
₹67.50 Cr still to spend
on 9,081 ongoing works
Works ongoing
9,081
Open the list of these works →
Sanctioned
₹111.81 Cr
Pure scheme (wage + material)
Expenditure since inception
₹44.31 Cr
39.6% of sanction
Balance cost (unspent)
₹67.50 Cr
Wage₹40.88 Cr
Material₹26.63 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore