Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
22 works
₹3.20 Cr sanctioned
₹3.02 Cr spent (94%)
02
Construction of Check Dam/Stop Dam
42 works
₹2.53 Cr sanctioned
₹2.07 Cr spent (82%)
03
Construction of Tank
13 works
₹1.66 Cr sanctioned
₹1.50 Cr spent (90%)
04
Repair & Maint of Check Dam/Stop Dam
10 works
₹1.49 Cr sanctioned
₹1.45 Cr spent (97%)
05
Construction of Bund
7 works
₹1.12 Cr sanctioned
₹1.01 Cr spent (90%)
06
Construction of Road and Culvert
8 works
₹97.89 L sanctioned
₹53.28 L spent (54%)
07
Works for Flood Control and Protection
7 works
₹67.12 L sanctioned
₹56.05 L spent (84%)
08
Boulder Check/Gully Plug
4 works
₹56.66 L sanctioned
₹47.40 L spent (84%)
09
Terracing
2 works
₹31.20 L sanctioned
₹29.40 L spent (94%)
10
Construction of Trench
4 works
₹20.63 L sanctioned
₹19.51 L spent (95%)