Showcase — Completed Works
Rollup last refreshed: 2026-08-16 10:42:45.210984
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
32 works
₹2.72 Cr sanctioned
₹2.48 Cr spent (91%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
14 works
₹1.97 Cr sanctioned
₹1.85 Cr spent (94%)
03
Works for Flood Control and Protection
18 works
₹1.73 Cr sanctioned
₹1.40 Cr spent (81%)
04
Construction of Check Dam/Stop Dam
19 works
₹1.08 Cr sanctioned
₹1.01 Cr spent (93%)
05
Plantation
5 works
₹47.04 L sanctioned
₹38.70 L spent (82%)
06
Terracing
3 works
₹42.40 L sanctioned
₹39.35 L spent (93%)
07
Construction of Bund
3 works
₹41.41 L sanctioned
₹31.60 L spent (76%)
08
Cattle Shed
32 works
₹25.60 L sanctioned
₹24.65 L spent (96%)
09
Construction of Embankment
2 works
₹24.22 L sanctioned
₹16.19 L spent (67%)
10
Constr of Cement Concrete Roads
11 works
₹15.23 L sanctioned
₹8.60 L spent (56%)