Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Constr of Cement Concrete Roads
4 works
₹9.10 Cr sanctioned
₹79,980 spent (0%)
02
Construction of Check Dam/Stop Dam
15 works
₹1.65 Cr sanctioned
₹1.41 Cr spent (86%)
03
Construction of Bund
7 works
₹87.77 L sanctioned
₹75.44 L spent (86%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹73.12 L sanctioned
₹57.05 L spent (78%)
05
Works for Flood Control and Protection
6 works
₹64.84 L sanctioned
₹48.96 L spent (76%)
06
Boulder Check/Gully Plug
7 works
₹61.24 L sanctioned
₹56.97 L spent (93%)
07
Construction of Road and Culvert
14 works
₹53.85 L sanctioned
₹58.22 L spent (108%)
08
Construction of Trench
3 works
₹30.44 L sanctioned
₹27.11 L spent (89%)
09
Land Development
13 works
₹29.79 L sanctioned
₹26.66 L spent (89%)
10
Farm Pond
71 works
₹17.79 L sanctioned
₹32.20 L spent (181%)